Louver YXA Assembly Line with EOL and Leak Tester
- Minimum Order Quantity
- 1 Roll
- Price
- 3000000 INR
- Voltage
- 220 V AC Volt (v)
- Surface Treatment
- Coated
Assembly Line Details:
Station-1: Assembly of fins No. (F1R) Assy. For verticals Fins No. 1,2,3 & 4 with Verticals Link.
Station-2: Assembly of fins No.(F2R) Assemble vertical fins with plat V Upper & Lower.
Station-3: Assembly Fixture (R) 3, 4) Assembled master fin assy. With rubber cushion, Knob stopper, stopper Plate & ornament fitting.
Station-4: Assembly assembled horizontal fins with plate-1 , 2 & LINK-H - RH.
Station-5: Assembly of Final assembled vertical fins with Case.
Station-6: Assembly Fixture (6 & 7) assembly assembled Horizontal fins with Plate - L & R
Station-7: Side Garnish-1 & 2 pressing./ FELT PESTING & Checking - RHsembly Fixture (6 & 7) assembly assembled Horizontal fins with Plate - L & R.
Station-8: Assembly Fixture 11- FOME PESTING Manually - RH
Station-9: Flow Testing (AIR) RH & LH and Assembly Fixture (L) 11 - FOME PESTING Manually LH.
Station #10: Assembly of fins No. (F1R) Assy. For verticals Fins No. 1,2,3 & 4 with Verticals Link
Station-11: (i)Side Garnish-1 & 2 pressing. / FELT PESTING & Checking - LH
(ii)Assembly Fixture ((L& R) 6 & 7) assembly assembled Horizontal fins with Plat - LH
(iii)Assembly of Final assembled vertical fins with Case - LH.
Station-12: (i)Assembly of fins No. (F1L) Assy. For verticals Fins No. 1,2,3 & 4 with Verticals Link -LH
(ii) Assembly of fins No.(F2L) Assemble vertical fins with plat V Upper & Lower -LH
(iii) Assembly Fixture (R) 3, 4) Assembled master fin assy. With rubber cushion, Knob stopper, stopper Plate & ornament fitting - LH
(iv) Assembly assembled horizontal fins with plate-1 ,2 &LINK-H - LH
Station-13: Station No. 13- EOL (L& R), for 1 unit
- Payment Terms
- Paypal Cheque
- Delivery Time
- 6-8 Week
- Main Export Market(s)
- Australia North America South America Eastern Europe Western Europe Middle East Central America Asia Africa
- Main Domestic Market
- All India
- Certifications
- ISO 9001:2015
![]() |
PARAMETRIC RESEARCH & CONTROL
All Rights Reserved.(Terms of Use) Developed and Managed by Infocom Network Private Limited. |