Back to top
Louver YXA Assembly Line with EOL and Leak Tester Louver YXA Assembly Line with EOL and Leak Tester Louver YXA Assembly Line with EOL and Leak Tester
Louver YXA Assembly Line with EOL and Leak Tester
Louver YXA Assembly Line with EOL and Leak Tester Louver YXA Assembly Line with EOL and Leak Tester

Louver YXA Assembly Line with EOL and Leak Tester

3000000 INR

Product Details:

  • Voltage 220 V AC Volt (v)
  • Surface Treatment Coated
  • Click to View more
X

Louver YXA Assembly Line with EOL and Leak Tester Price And Quantity

  • 1 Roll
  • 3000000 INR

Louver YXA Assembly Line with EOL and Leak Tester Product Specifications

  • 220 V AC Volt (v)
  • Coated

Louver YXA Assembly Line with EOL and Leak Tester Trade Information

  • Paypal Cheque
  • 6-8 Week
  • Australia North America South America Eastern Europe Western Europe Middle East Central America Asia Africa
  • All India
  • ISO 9001:2015

Product Description

Louver YXA Assembly Line With EOL & Leak Tester.


Assembly Line Details:


Station-1: Assembly of fins No. (F1R) Assy. For verticals Fins No. 1,2,3 & 4 with Verticals Link.


Station-2: Assembly of fins No.(F2R) Assemble vertical fins with plat V Upper & Lower.


Station-3: Assembly Fixture (R) 3, 4) Assembled master fin assy. With rubber cushion, Knob stopper, stopper Plate & ornament fitting.


Station-4: Assembly assembled horizontal fins with plate-1 , 2 & LINK-H - RH.


Station-5: Assembly of Final assembled vertical fins with Case.


Station-6: Assembly Fixture (6 & 7) assembly assembled Horizontal fins with Plate - L & R


Station-7: Side Garnish-1 & 2 pressing./ FELT PESTING & Checking - RHsembly Fixture (6 & 7) assembly assembled Horizontal fins with Plate - L & R.


Station-8: Assembly Fixture 11- FOME PESTING Manually - RH


Station-9: Flow Testing (AIR) RH & LH and Assembly Fixture (L) 11 - FOME PESTING Manually LH.


Station #10: Assembly of fins No. (F1R) Assy. For verticals Fins No. 1,2,3 & 4 with Verticals Link


Station-11: (i)Side Garnish-1 & 2 pressing. / FELT PESTING & Checking - LH

(ii)Assembly Fixture ((L& R) 6 & 7) assembly assembled Horizontal fins with Plat - LH

(iii)Assembly of Final assembled vertical fins with Case - LH.


Station-12: (i)Assembly of fins No. (F1L) Assy. For verticals Fins No. 1,2,3 & 4 with Verticals Link -LH

(ii) Assembly of fins No.(F2L) Assemble vertical fins with plat V Upper & Lower -LH

(iii) Assembly Fixture (R) 3, 4) Assembled master fin assy. With rubber cushion, Knob stopper, stopper Plate & ornament fitting - LH

(iv) Assembly assembled horizontal fins with plate-1 ,2 &LINK-H - LH


Station-13: Station No. 13- EOL (L& R), for 1 unit

Enter Buying Requirement Details
Email Id
Mobile number

Other Products in 'Assembly Lines' category



PARAMETRIC RESEARCH & CONTROL trusted seller